24 Hardware installation and configuration
3
Securely install the rail kit and then slide the server into place.
4
Ensure the server is supported in the rear by the rail kit.
5 Bolt the front of the server to the front of the rail kit.
--End--
Connect the hardware
For more information about the front and rear panels of the AS 5300
server, see Figure 1 "Front panel of the AS 5300 server" (page 25) and
Figure 2 "Rear panel of the AS 5300 server" (page 25) .
Application Server 5300
Nortel AS 5300 Installation
NN42040-300 01.04
4 November 2008
Copyright © 2007-2008 Nortel Networks
.