5 If a replication job is broken, then the operator must correct and
reschedule the job as follows:
a To correct and reschedule a replication job, select the DBMS
Jobs tab.
b Select the required job and click Edit.
The Edit Job window opens.
c In the Edit Job window, change the job status to Normal.